SFCC Building 17 Renovation
Renovation of a designated portion of Building 17 including selective demolition, new finishes, lighting, HVAC diffuser replacement, and other Work indicated in the Contract Documents. Work also includes a fire protection system in portions of the building that are outside of the renovation area. This Work will take place on an existing site currently in use and occupied by the Owner as a community college.
Specifications
(click to expand/collapse)

Name | Size | |||
01 - Cover, Signiture Page, Title Page, Table of Contents and Index of Drawings | 441.2 KB | |||
02 - Division 0 - Bidding and Contract Requirements | 3.0 MB | |||
03 - Division 1 - General Requirements | 2.5 MB | |||
04 - Division 2 - Existing Conditions | 86.7 KB | |||
05 - Division 6 - Wood, Plastics and Composites | 241.2 KB | |||
06 - Division 7 - Thermal and Moisture Protection | 198.3 KB | |||
07 - Division 8 - Doors and Windows | 243.9 KB | |||
08 - Division 9 - Finishes | 845.8 KB | |||
09 - Division 10 - Specialties | 243.5 KB | |||
10 - Division 11 - Equipment | 105.8 KB | |||
11 - Division 21 - Fire Suppression | 168.3 KB | |||
12 - Division 22 - Plumbing | 490.7 KB | |||
13 - Division 23 - HVAC | 924.2 KB | |||
14 - Division 26 - Electrical | 1.5 MB | |||
15 - Division 27 - Communications | 589.0 KB | |||
16 - Division 28 - Electrical Safety | 495.7 KB |