LV - Electrical Infrastructure Upgrade Phase 3 (Re-Bid)

The Project consists of upgrading campus primary 13.2kV distribution system and 600V generator-back infrastructure to current code, replacing the existing low-voltage 600V switchboards/distribution boards/motor control centers/and branch panels at various buildings and cottages, and re-configuring the existing shared neutral of 120V wirings at Cottages to install AFCI circuit breakers per current code.