LV - Electrical Infrastructure Upgrade Phase 3 (Re-Bid)

The Project consists of upgrading campus primary 13.2kV distribution system and 600V generator-back infrastructure to current code, replacing the existing low-voltage 600V switchboards/distribution boards/motor control centers/and branch panels at various buildings and cottages, and re-configuring the existing shared neutral of 120V wirings at Cottages to install AFCI circuit breakers per current code.

Status

Bidding Closed

Prebid Date8/4/20 10:00 am

Bid Date9/1/20 3:00 pm

Company & Contacts

NAC Architecture

Bill Rash - brash@nacarchitecture.com  
(509) 838-8240

Location

Medical Lake, WA

Project Estimate: $3,250,000 to $3,750,000

Bidders may download electronic files at no cost. Bidders may obtain printed documents by choosing the “Order” option. Refundable documents are available for qualified Bidders. Qualifications and instructions are listed in the ‘Documents’ Section

A mandatory virtual pre-bid Zoom meeting will be held at 10:00 AM, Tuesday, August 4, 2020. See Advertisement for Bids for instructions. On-Site walk-throughs will follow the next day, 11:00 AM and 1:00 PM, Wednesday, August 5, 2020 limited to groups of (10) people max. (assignments to each group will be made during the Pre-Bid meeting).