LV - Electrical Infrastructure Upgrade Phase 3 (Re-Bid)

The Project consists of upgrading campus primary 13.2kV distribution system and 600V generator-back infrastructure to current code, replacing the existing low-voltage 600V switchboards/distribution boards/motor control centers/and branch panels at various buildings and cottages, and re-configuring the existing shared neutral of 120V wirings at Cottages to install AFCI circuit breakers per current code.
  Specifications (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - Introductory Information 605.6 KB
02 - Division 00 - Procurement and Contracting Requirements 2.4 MB
03 - Division 01 - General Requirements 3.3 MB
04 - Division 08 - Openings 194.7 KB
05 - Division 09 - Finishes 182.1 KB
06 - Division 26 - Electrical 2.8 MB
07 - Division 31 - Earthwork 130.8 KB
08 - Division 32 - Exterior Improvements 409.4 KB