LV - Electrical Infrastructure Upgrade Phase 3 (Re-Bid)
The Project consists of upgrading campus primary 13.2kV distribution system and 600V generator-back infrastructure to current code, replacing the existing low-voltage 600V switchboards/distribution boards/motor control centers/and branch panels at various buildings and cottages, and re-configuring the existing shared neutral of 120V wirings at Cottages to install AFCI circuit breakers per current code.
Specifications
(click to expand/collapse)

Name | Size | |||
01 - Introductory Information | 605.6 KB | |||
02 - Division 00 - Procurement and Contracting Requirements | 2.4 MB | |||
03 - Division 01 - General Requirements | 3.3 MB | |||
04 - Division 08 - Openings | 194.7 KB | |||
05 - Division 09 - Finishes | 182.1 KB | |||
06 - Division 26 - Electrical | 2.8 MB | |||
07 - Division 31 - Earthwork | 130.8 KB | |||
08 - Division 32 - Exterior Improvements | 409.4 KB |