Real World Academy - Early Site Development

Site clearing; rough grading; topsoil and excess soil stockpiling; related erosion, sedimentation, and dust control; installation of underground water and sanitary sewerage service; modification and extension of existing irrigation systems; and other Work indicated in the Contract Documents. This Work will take place on a new site adjacent to existing facilities currently in use and occupied by the Owner as a high school, co-operative transportation operations and maintenance facility, and a technical skills center.
  01 - General (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
G0.01 - Cover Sheet & Index 654.0 KB
  02 - Civil (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
1 of 4 - Survey 1.9 MB
2 of 4 - Survey 1.8 MB
3 of 4 - Survey 1.7 MB
4 or 4 - Survey 1.6 MB
C0.01 - Project Overview 353.7 KB
C1.1 - Demolition Plan 297.5 KB
C1.2 - Demolition Plan 225.9 KB
C1.3 - Demolition Plan 191.1 KB
C1.4 - Demolition Plan 161.9 KB
C2.1 - Stormwater Plan 290.2 KB
C2.2 - Stormwater Plan Details 264.9 KB
C3.1 - Grading Plan 354.6 KB
C3.2 - Grading Plan 350.9 KB
C3.3 - Grading Plan 276.3 KB
C4.1 - Utility Plan 250.4 KB
C4.2 - Utility Plan 290.0 KB
C4.3 - Utility Plan 308.5 KB
C4.4 - Utility Plan 331.2 KB
C5.1 - Construction Details 487.8 KB
C5.2 - Construction Specifications 455.1 KB
  03 - Landscape (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
L1.00 - Landscape Plan 419.6 KB
L2.00 - Irrigation Plan 468.1 KB
L3.00 - Details 339.4 KB