Moses Lake School District Administration Office

The scope of work consists of the remodel of an existing single story 44,900 sq. ft. building into general office space for school district administration program offices. Work consists of demolition, finishes, doors, casework, ceilings, specialties, mechanical, electrical, and other work indicated on the Contract Documents. Exterior site improvements are limited to minor landscape repair and asphalt sealing. Scope of work includes the following: Division 1 - General Requirements, Division 2 - Existing Conditions, Division 5 - Metals, Division 6 - Wood Plastics and Composites, Division 7 - Thermal and Moisture Protection, Division 8 - Openings, Division 9 - Finishes, Division 10 - Specialties, Division 11 - Equipment, Division 12 - Furnishings, Division 21 - Fire Suppression, Division 22 - Plumbing, Division 23 - Heating Ventilating and Air Conditioning (HVAC), Division 26 - Electrical, Division 27 - Communications, Division 28 - Electronic Safety and Security, Division 32 - Exterior Improvements
  Addendum #1 (click to expand/collapse)
Name Size
ADDENDA-1-COMB 5.0 MB
  Addendum #2 (click to expand/collapse)
Name Size
ADDENDUM-2-COMB 2.3 MB
  Addendum #3 (click to expand/collapse)
Name Size
Addenda-3_Combined 9.1 MB
  Addendum #4 (click to expand/collapse)
Name Size
Addendum-4-ELEC 21.2 KB