Moses Lake School District Administration Office

The scope of work consists of the remodel of an existing single story 44,900 sq. ft. building into general office space for school district administration program offices. Work consists of demolition, finishes, doors, casework, ceilings, specialties, mechanical, electrical, and other work indicated on the Contract Documents. Exterior site improvements are limited to minor landscape repair and asphalt sealing. Scope of work includes the following: Division 1 - General Requirements, Division 2 - Existing Conditions, Division 5 - Metals, Division 6 - Wood Plastics and Composites, Division 7 - Thermal and Moisture Protection, Division 8 - Openings, Division 9 - Finishes, Division 10 - Specialties, Division 11 - Equipment, Division 12 - Furnishings, Division 21 - Fire Suppression, Division 22 - Plumbing, Division 23 - Heating Ventilating and Air Conditioning (HVAC), Division 26 - Electrical, Division 27 - Communications, Division 28 - Electronic Safety and Security, Division 32 - Exterior Improvements

Status

Bidding Closed

Prebid Date7/11/18 2:00 pm

Bid Date8/2/18 5:00 pm

Company & Contacts

NAC Architecture

Kris Jeske kjeske@nacarchitecture.com   509-838-8240

Location

Moses Lake, Eastern WA

Bidders may download electronic files at no cost. Bidders may obtain printed documents by choosing the “Order” option. Refundable documents are available for qualified Bidders. Qualifications and instructions are listed in the ‘Documents’ Section

Pre-Bid Conference: A Pre-Bid Conference is scheduled for July 11 at 2:00 pm and held at the project site located at 1620 S. Pioneer way, Moses Lake, Washington.