Pine Lodge Lift Station Replacement

The work includes, but is not limited to the following: Two new 180 GPM self-priming non-clog above-grade centrifugal sewage pumps Two 3-phase, 60-Hz, 460 V A/C pump motors All associated valves, piping and controls as shown on drawings and specifications New fiberglass pump station enclosure, 10’ W x 14’ L x 9’ high, on CIP concrete pad with integral foundation walls and footings. 3 Bid alternates, including 1) Deduct for using precast wet well lid in lieu of cast-inplace, 2) Deduct for using pumper tank truck in lieu of bypass pumping, and 3) Add to install new coating inside existing wet well, on walls and floor. Scope of work includes the following: Division 0 - Procurement and Contracting Requirement, Division 1 - General Requirements, Division 26 - Electrical, Division 27 - Communications, Division 43 - Process Gas and Liquid Handling Purification and Storage Equipment
  Addendum #1 (click to expand/collapse)
Name Size
2017-437-Addendum-01-180420 64.6 KB
  Addendum #2 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2017-437-Pre-Bid-Attendance 60.4 KB
PL-ADD-02 6.8 MB