Pine Lodge Lift Station Replacement

The work includes, but is not limited to the following: Two new 180 GPM self-priming non-clog above-grade centrifugal sewage pumps Two 3-phase, 60-Hz, 460 V A/C pump motors All associated valves, piping and controls as shown on drawings and specifications New fiberglass pump station enclosure, 10’ W x 14’ L x 9’ high, on CIP concrete pad with integral foundation walls and footings. 3 Bid alternates, including 1) Deduct for using precast wet well lid in lieu of cast-inplace, 2) Deduct for using pumper tank truck in lieu of bypass pumping, and 3) Add to install new coating inside existing wet well, on walls and floor. Scope of work includes the following: Division 0 - Procurement and Contracting Requirement, Division 1 - General Requirements, Division 26 - Electrical, Division 27 - Communications, Division 43 - Process Gas and Liquid Handling Purification and Storage Equipment

Status

Bidding Closed

Prebid Date8/15/18 10:00 am

Bid Date8/29/18 3:00 pm

Company & Contacts

NAC Architecture

Bill Rash brash@nacarchitecture.com   (509) 838-8240

Location

Medical Lake, Eastern WA

Project Estimate: $325,000.00 – $375,000.00

Bidders may download electronic files at no cost. Bidders may obtain printed documents by choosing the “Order” option. Refundable documents are available for qualified Bidders. Qualifications and instructions are listed in the ‘Documents’ Section.

PRE-BID WALK-THROUGH: 10:00 AM, Wednesday, August 15, 2018 CSS Administration, Building “M” conference room, Pine Lodge Facility, 751 S. Pine St., Medical Lake, WA 99022.