ESH 1N3 and 3N3 Ward Renovation

The Project consists of interior renovation of two former Adult Psychiatric Unit (APU) wards into new 25-bed Forensic Services Unit (FSU) wards for certification, evaluation and treatment of patients who have committed crimes but pled Not Guilty by Reason of Insanity. These wards are located on the First and Third floors of the north wing of the main Eastlake Building at Eastern State Hospital. Additional work will include creating smoke barrier walls on all four floors of the 3-North wing and integrating a passive smoke control system. The second floor of this wing is currently occupied by an FSU ward and will continue to be occupied during construction, so the project will include infection control measures and phasing.

Status

Accepting Bids

Prebid Date12/13/18 2:00 pm

Bid Date1/18/19 2:00 pm

Company & Contacts

NAC Architecture

Bill Rash brash@nacarchitecture.com   (509) 838-8240

Location

Medical Lake, Eastern WA

Bidders may download electronic files at no cost. Bidders may obtain printed documents by choosing the “Order” option. Refundable documents are available for qualified Bidders. Qualifications and instructions are listed in the ‘Documents’ Section

Project Estimate: $5,320,000.00 – $5,880,000.00

Mandatory Pre-Bid Meeting: 2:00 P.M., Thursday, December 13, 2018, ESH Administration Building, 850 W. Maple St., Medical Lake, WA 99022