Quincy School District Mechanical Upgrades

The Work is primarily at Monument Elementary. There are several miscellaneous projects at several other buildings outlined below. MONUMENT ELEMENTARY: The work consists of replacement of existing mechanical systems including boilers, pumps, chiller, modifications to the controls system associated with the upgraded equipment and replacement of glycol for both systems. Acquisition of equipment will be critical to the successful completion of the project. Miscellaneous work includes replacing an existing exhaust fan at staff toilets. The location of the project is 1400 13th Avenue SW. PIONEER ELEMENTARY: Primary work consists of replacement of (6) existing unit ventilators including all needed trim and patch work required for a complete installation. Miscellaneous work includes installing new exhaust fans at all staff and student toilet rooms including electrical connections and trim and patch work required for a complete installation. The location of the project is 224 J Street SE. MOUNTAIN VIEW ELEMENTARY: Primary work consists of replacement of (2) existing unit ventilators including all needed trim and patch work required for a complete installation. Miscellaneous work includes installing new exhaust fans at all staff and student toilet rooms including electrical connections and trim and patch work required for a complete installation. The location of the project is 119 D Street NW. QUINCY MIDDLE SCHOOL: Primnary work consists of installing new exhaust fans at (2) staff toilets. An alternate bid item includes installing a new Type I exhaust hood. The location of the project is 16 6th Ave SE.
  Addendum #1 (click to expand/collapse)
Name Size
MechUpgrades_Addendum_1 Combined 280.8 KB