Quincy School District Mechanical Upgrades

The Work is primarily at Monument Elementary. There are several miscellaneous projects at several other buildings outlined below. MONUMENT ELEMENTARY: The work consists of replacement of existing mechanical systems including boilers, pumps, chiller, modifications to the controls system associated with the upgraded equipment and replacement of glycol for both systems. Acquisition of equipment will be critical to the successful completion of the project. Miscellaneous work includes replacing an existing exhaust fan at staff toilets. The location of the project is 1400 13th Avenue SW. PIONEER ELEMENTARY: Primary work consists of replacement of (6) existing unit ventilators including all needed trim and patch work required for a complete installation. Miscellaneous work includes installing new exhaust fans at all staff and student toilet rooms including electrical connections and trim and patch work required for a complete installation. The location of the project is 224 J Street SE. MOUNTAIN VIEW ELEMENTARY: Primary work consists of replacement of (2) existing unit ventilators including all needed trim and patch work required for a complete installation. Miscellaneous work includes installing new exhaust fans at all staff and student toilet rooms including electrical connections and trim and patch work required for a complete installation. The location of the project is 119 D Street NW. QUINCY MIDDLE SCHOOL: Primnary work consists of installing new exhaust fans at (2) staff toilets. An alternate bid item includes installing a new Type I exhaust hood. The location of the project is 16 6th Ave SE.

Status

Accepting Bids

Prebid Date3/19/19 3:15 pm

Bid Date4/2/19 2:30 pm

Company & Contacts

NAC Architecture

Randy Wilson, rwilson@nacarchitecture.com   (509) 838-8240

Location

Quincy, WA

Project Estimate: $500,000.00 to $600,000.00

Bidders may download electronic files at no cost. Bidders may obtain printed documents by choosing the “Order” option. Refundable documents are available for qualified Bidders. Qualifications and instructions are listed in the ‘Documents’ Section

03/19/19 at 3:15 PM – Optional Pre-bid Conference: A non-mandatory pre-bid conference will be held on Tuesday, March 19, 2019, 3:15 PM at Monument ES.