Quincy School District Mechanical Upgrades

The Work is primarily at Monument Elementary. There are several miscellaneous projects at several other buildings outlined below. MONUMENT ELEMENTARY: The work consists of replacement of existing mechanical systems including boilers, pumps, chiller, modifications to the controls system associated with the upgraded equipment and replacement of glycol for both systems. Acquisition of equipment will be critical to the successful completion of the project. Miscellaneous work includes replacing an existing exhaust fan at staff toilets. The location of the project is 1400 13th Avenue SW. PIONEER ELEMENTARY: Primary work consists of replacement of (6) existing unit ventilators including all needed trim and patch work required for a complete installation. Miscellaneous work includes installing new exhaust fans at all staff and student toilet rooms including electrical connections and trim and patch work required for a complete installation. The location of the project is 224 J Street SE. MOUNTAIN VIEW ELEMENTARY: Primary work consists of replacement of (2) existing unit ventilators including all needed trim and patch work required for a complete installation. Miscellaneous work includes installing new exhaust fans at all staff and student toilet rooms including electrical connections and trim and patch work required for a complete installation. The location of the project is 119 D Street NW. QUINCY MIDDLE SCHOOL: Primnary work consists of installing new exhaust fans at (2) staff toilets. An alternate bid item includes installing a new Type I exhaust hood. The location of the project is 16 6th Ave SE.
  01 - General (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
G0.01 - Index Sheet- Volume 1 67.9 KB
  02 - Mechanical (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
M0.01 - Notes, Legends and Schedules 375.1 KB
M1.01 - Monument Elementary Plan Demolition 296.9 KB
M1.02 - Monument Elementary Plan Mechanical 318.1 KB
M1.03 - Monument Elementary Boiler Replacement 264.4 KB
M2.01 - Mountain View Elementary - Demolition 235.7 KB
M2.02 - Mountain View Elementary - HVAC 440.9 KB
M3.01 - Pioneer Elementary - Demolition 196.9 KB
M3.02 - Pioneer Elementary - Mechanical 440.8 KB
M4.01 - Quincy Middle School Plan - Mechanical 466.4 KB
  03 - Electrical (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
E0.02 - Mechanical Schedules 162.8 KB
E0.1 - Electrical Symbols & Abbreviations 400.1 KB
E3.10 - Monument Elementary - North Plan - Power 171.5 KB
E3.11 - Monument Elementary - South Plan - Power 190.9 KB
E3.20 - Mountain View Plan - Power 241.0 KB
E3.21 - Enlarged Plan - Mountain View Plan 220.6 KB
E3.40 - Pioneer Elementary Overall Plan - Power 372.3 KB
E3.41 - Pioneer Elementary Partialplan - Power 197.1 KB
E3.50 - Quincy Middle School Plan - Power 110.4 KB
E6.10 - Monument One-Line Diagram 255.8 KB
E6.11 - Monument Panel Schedules 520.1 KB
E6.20 - Mountain View One-Line Diagram 400.7 KB
E6.21 - Mountain View Panel Schedule 633.9 KB
E6.40 - Pioneer Elementary One-Line Diagram 481.4 KB
E6.41 - Pioneer Elementary Panel Schedule 541.3 KB
E6.42 - Pioneer Elementary Panel Schedule 187.8 KB
E6.50 - Quincy Middle School One-Line Diagram 632.4 KB
E6.51 - Quincy Middle Panel Schedule 520.6 KB
E6.52 - Quincy Middle Panel Schedule 592.6 KB
E7.20 - Details - Power 67.9 KB