Public Jobs

Bidding Closed
4/25/19 2:00 pm
Quincy School District Improvement Projects (Re-Bid)
NAC Architecture
Quincy, WA
The Work consists of several projects located throughout school district buildings.
Bidding Closed
4/25/19 2:00 pm
Quincy School District Mechanical Upgrades (Re-Bid)
NAC Architecture
Quincy, WA
The Work is primarily at Monument Elementary. There are several miscellaneous projects at several other buildings outlined below. MONUMENT ELEMENTARY: The work consists of replacement of existing mechanical systems including boilers, pumps, chiller, modifications to the controls system associated with the upgraded equipment and replacement of glycol for both systems. Acquisition of equipment will be critical to the successful completion of the project. Miscellaneous work includes replacing an existing exhaust fan at staff toilets. The location of the project is 1400 13th Avenue SW. PIONEER ELEMENTARY: Primary work consists of replacement of (6) existing unit ventilators including all needed trim and patch work required for a complete installation. Miscellaneous work includes installing new exhaust fans at all staff and student toilet rooms including electrical connections and trim and patch work required for a complete installation. The location of the project is 224 J Street SE. MOUNTAIN VIEW ELEMENTARY: Primary work consists of replacement of (2) existing unit ventilators including all needed trim and patch work required for a complete installation. Miscellaneous work includes installing new exhaust fans at all staff and student toilet rooms including electrical connections and trim and patch work required for a complete installation. The location of the project is 119 D Street NW. QUINCY MIDDLE SCHOOL: Primary work consists of installing new exhaust fans at (2) staff toilets. An alternate bid item includes installing a new Type I exhaust hood. The location of the project is 16 6th Ave SE.
Bids due in 21 days
5/16/19 4:00 pm
Eastmont School District Elementary Schools Additions
NAC Architecture
East Wenatchee, WA
Construction of additions to existing school campuses, and sitework related thereto. This Work will take place on existing sites currently in use and occupied by the Owner as elementary schools and a high school.
Bidding Closed
4/11/19 2:00 pm
Lewis and Clark High School - Classroom and Commons Addition
NAC Architecture
Spokane, WA
The Work of Project is defined by the Contract Documents and consists of the following: 1. New construction of an addition to the existing building with new classrooms, commons, and kitchen. 2. Renovation of existing classrooms and other support spaces (e.g. kitchen & library) within the existing historic main building. 3. Site work related to the addition. 4. Work will take place on an existing site currently in use and occupied by the Owner as a comprehensive high school.
Bidding Closed
4/2/19 3:00 pm
Selah School District - Lince Elementary School
NAC Architecture
Selah, WA
New construction of a kindergarten school building, and sitework related thereto. This Work will take place on an existing site currently in use and occupied by the Owner as a pre-school, school district administration offices, and maintenance & operations shops.